Trade Estimating

Estimates for Every Trade

Single-trade takeoffs measured in the units your trade actually bids in.

A concrete sub needs formwork in contact area, not wall area. A sheet metal contractor needs duct by size and gauge. A drywall bid lives or dies on board count and finish levels. Our trade estimators know those differences, and every takeoff is built the way your trade prices work.

Masons laying block on a commercial wall
Same-dayMany single-trade takeoffs
27 tradesStructure to site, MEP to finishes
Divisions 03 to 33CSI MasterFormat structure
$250 to $600Typical single-trade fee
Qty or pricedYour unit costs or ours
All Trades

Pick Your Trade

Grouped by how a building goes together. Don't see yours? Ask: we've almost certainly priced it.

Structure & Shell

Foundations, structure and the frame everything else hangs on.

Envelope & Protection

Everything that keeps weather, water, heat and fire where they belong.

Interior Finishes

The trades that turn a shell into a space someone can use.

MEP & Site

Building systems, low voltage and the ground around the building.

Why It Matters

Generic Takeoffs Miss Trade Detail

A general takeoff counts the building. A trade takeoff counts what your crew installs and what your supplier ships.

Your units, not ours

SFCA for formwork, pounds for rebar, linear feet by size for pipe and duct, board count for drywall: measured the way you price.

Waste and laps as specified

Waste factors, lap lengths, coverage rates and cut-offs follow the specification and your standard practice, and they're stated.

Scope gaps flagged

Items that fall between trades (blocking, sleeves, firestopping, access panels) are called out so they don't land on you by default.

Reference

CSI Divisions We Estimate

We work to the current 50-division MasterFormat structure. These are the divisions most of our trade work falls into.

DivisionTitleTypical scope we take off
03ConcreteFootings, slabs, walls, columns, formwork, reinforcing, post-tensioning
04MasonryCMU, brick, stone veneer, mortar, grout, joint reinforcement
05MetalsStructural steel, joists, deck, miscellaneous metals, cold-formed framing
06Wood, Plastics & CompositesRough framing, sheathing, trusses, finish carpentry, millwork
07Thermal & Moisture ProtectionRoofing, waterproofing, insulation, air barriers, fireproofing, sealants
08OpeningsDoors, frames, hardware, storefront, curtain wall, windows
09FinishesDrywall, ceilings, flooring, tile, painting and coatings
22PlumbingFixtures, domestic water, sanitary and storm, gas piping
23HVACEquipment, ductwork, hydronic piping, air distribution, controls
26ElectricalService, distribution, feeders, branch circuits, lighting
27CommunicationsStructured cabling, pathways, telecom rooms
31 to 33Earthwork, Exterior Improvements, UtilitiesExcavation, grading, paving, landscaping, site utilities

Need a division that isn't listed: specialties, equipment, conveying, fire suppression? Ask in your quote request.

Formwork set up for a concrete wall pour
One Trade or Many

Sub Bidding One Scope, or GC Pricing Them All

Subcontractors usually need one division done properly. General contractors need every division done consistently, so the trade numbers can be compared and rolled up. We handle both from the same team.

  • Single trade: typically $250 to $600, often back the same day.
  • Multiple trades: each division priced to the same assumptions, so nothing is double-counted at the interfaces.
  • Quantities only: skip our pricing and apply your own unit costs and historical cost codes.
Ready to Get Started?

Send Us Your Trade Scope

Tell us which trade, attach the drawings, and you'll have a fixed fee and a delivery date back: usually within a few hours.

↑